WHY HERE?
In planning the new energy network NESO set out 4 criteria for site choices below.
It is fair to say that not one of these criteria have been met.
Using the criteria outlined by NESO National Grid performed a site search for a suitable location - their decisions on site choices are shown here.
There has been no credible consideration for brownfield sites or areas that are within the criteria.